 | Sample Retrieval from Surface to 80 feet |
 | Mobilization is fast and Economical |
 | Off-set Placement of Probe for Multiple Sampling
Locations Without Moving The Vehicle |
 | Less Disruption to Site Operations |
 | Minimal Surface Disturbance |
 | Virtually Eliminates Soil Cuttings and Disposal
Costs |
 | Allows Multiple Tasks to be Performed with One
Mobilization |
 | More Samples, Less Time, Improved Site
Characterization = Less Cost |
 | Installation of Small Diameter Monitoring Wells |
 | ORC ®, HRC
® Injection |
 | Limited Access Applications |